Table of Contents

Shared Projects

Smart Environments

Smart Environments

Presentation

Software Simulation V0.4

Controls:

  • W: Visualize range
  • R: Road brick
  • P: Parking brick
  • E: Exit brick

Link

Software Simulation V1.0
Controls:

  • R: Road brick
  • P: Parking brick
  • E: Exit brick

Link

XP lab

CA1
====== XP-Lab Status ======

Arthur van Andel and I subscribed for doing the overall managing of the XP event. There are a few points we need to keep in check.

  • Space - Every group deserves enough space for their project
  • Time - Applying some pressure to ensure the deadline is not exceeded
  • Arrangements - The food and drinks still need to be arranged!!
  • Problem solving - If a group is having trouble with it's members or is struggling with a technical problem, we need to call in an external person.

Timeline:

  • 19-09-09 (1:40pm) - Mailing for status updates
  • 20-09-09 (12:00am) - Deadline status updates
  • 21-09-09 (-) - Starting to build up the XP-Lab
  • 22-09-09 (13:45-15:30) - Event!!